Download PDF- Abstract
Traditional design–bid–build guidelines suggest that engineering estimates should be within +/−10% of the lowest contractor bid and recommend this value as a reference to identify anomalies in the bidding process. This guidance, however, neglects delivery approaches such as design–build (D–B). This research examines 305 D–B highway projects procured using best-value and identifies the underlying reasons for bid dispersion and cost estimates inaccuracies. This study found an average bid dispersion of 27%, suggesting that a larger threshold (i.e., 25%) is needed to account for the inherent variability of D–B projects. This study also found that engineering estimates are on average 2% more than the awarded price. This result contradicts findings in existing literature and suggests that current practice in D–B best-value may be more conservative than other procurement methods. The study explores four potential reasons for bid dispersion and engineering estimate inaccuracies and suggests strategies for improvement. By providing a better understanding of bid dispersion and engineering estimate accuracy, this study will ultimately assist in the development of new policies and processes for D–B best-value projects.
- Creator
- Date Issued
- 2021
- Academic Affiliation
- Journal Title
- Journal Issue/Number
- 7
- Journal Volume
- 147
- Last Modified
- 2023-07-11
- Resource Type
- Rights Statement
- DOI
- ISSN
- 1943-7862
- Language
Relationships
Items
Thumbnail | Title | Date Uploaded | Visibility | Actions |
---|---|---|---|---|
Gaikwad_R3_Challenges_in_Engineering_Estimates.pdf | 2023-07-11 | Public | Download |